Lead Time:
The first time we cut your project, we usually expect an
initial lead time of 2 weeks. Subsequent orders
will be cut in as little as 2 weeks or less provided the material and your
tooling are at our facility.
Setup Fees:
Mag-Knight never charges setup fees; this is unheard of in
the industry. $0
Terms and Conditions:
- Validity: Quotation is valid for 60 days.
- Revisions: Changes to the RFQ will invalidate this
quotation.
- Taxes: All applicable local, state, and federal taxes
will be added to the above quotation.
- First article inspections will not be sent unless
requested by customer.
- Drawing tolerance tighter than +/- .015” will be
ignored. Tightest tolerance will be +/-.015. Unspecified tolerances will be
+/-.032”.
- Shipment: All prices, unless otherwise noted, are FOB
our plant, Snohomish, WA.
- Payment: Once credit application is submitted and
approved, Net 30. Otherwise COD. A 50% deposit is required for all jobs over
$1000 USD.
- Unless otherwise specified, material fallout is the
property of Mag-Knight Inc.
- Liability is limited to the replacement of cutting
services provided by Mag-Knight Inc.
- If Mag-Knight is incapable of cutting the material as
quoted, any unused material will be returned to the customer (if supplied by
customer). Mag-Knight will not be held liable to produce parts if we are
incapable of doing so.
- All unused dies left at Mag-Knight Inc. become property
of Mag-Knight after (12) months of non-use.
- All unused material left at Mag-Knight Inc. becomes
property of Mag-Knight after (12) months of non-use.
- Quantity variance is subject to 10% under-run/over-run.
- To save time, we may opt to leave your die cut parts in
the webbing.
- We assume no responsibility for damage to dies not
designed nor made by us.
- Price quantity breakdowns are non-cumulative. We must
run all of the material at once to achieve these prices. If you are supplying
the material and it arrives after we cut the first batch, you cannot add the
part count amount together to achieve the lower price.
- If lower quantities are ordered than delineated above, a
higher charge will apply.
 |